Tuesday, May 5, 2009
The Ceiling -- Part Three
The disrepair was about to begin, or repair or whatever it should be called... Tom had taken down all the old tiles and the next day he and Byran came over to help put up those runners and put the new ones in. Things were moving along smoothly and that should have been a hint as to what was about to happen. They figured about a 2 hour job at the most and I would have a new ceiling... another hint.
Bryan -- who recently became engaged to our daughter Tammy -- wanted things to be right. His heart is in the right place... that corner where the plumbing was repaired for the upstairs was just below the level of the tile. He said if we pull up that pipe with an old wire coat hanger, it should work -- another hint of doom and disaster. The plumbing hung down about an inch below the tile. I said you could cut an area out, it wouldn't really show....I was thinking of an easy way. It was decided to pull up that plumbing and do it right. Now the chore was finding an old wire coat hanger and that believe it or not was a chore. We finally found one in an upstairs closet. Pliers, screws, the operation was now underway. Slowly the plumbing was brought up to where it should be BUT WAIT... one little side tract of the plumbing was still too low. So a trip to the hardware store was in order. A bracket or brace was needed over here, might have to cut an inch up on this pipe there, then connect it back up again....
They returned from the hardware store, cut a little here, connected a piece there and viola it looked great and should be perfect... So Tom goes upstairs and runs the water in the tub. Bryan and I are downstairs with our fingers crossed and a little drip is spotted. So back to the hardware store to buy something for the "joints", not sure what was wrong. I think it might have been a larger plier to tighten up a connection but I'm not sure. A slop of this here, wipe at little there, tighten this here make sure that's ok there. Tom goes upstairs again and runs the water -- NO LEAK. Whoo Hoo. Then all of a sudden we hear this CRACK, Bryan and I look at each other -- no leak... then all of a sudden there is water running down the side of the wall and he yells to Tom to shut the water off.
Well wouldn't you know, the Y connection between the commode and the tub, the sewer line, snapped. OH NO BUCKWHEAT. So back to the hardware store, need pipe for the size of the sewer line with the proper things to make a conneciton. Some of this, some of that -- good thing they bought that special glue and those pliers.... Finally they finished, Tom goes up stairs once again to run the water -- NO LEAKS... DA DAH Time now to cut that last piece of tile to fit into that corner...
So what should have been a 2 hour job turned into a 2 day job but it sure does look beautiful.... Now for the kitchen wall...
Smile -- it's contagious and it sure helps when doing something like a cieling :o)